Getting to Know the Project… With an estimated timeline of one year, CJR Renewables is responsible for all mechanical, electrical and civil works on the solar park, which includes engineering, construction, equipment assembly and material supply, as well as commissioning and all necessary teste for power-up and synchronization of the network.

Project Description

Client

| EDP Renewables

Scope | BOS – Engeneering, Procurement and Construction

Location | Alenquer, Portugal

Installed Power | 202.12 MWP

Our Action

  • 312.384 photovoltaic modules
  • 55.404 piles
  • 56,5 km of cable trenches
  • 4.501 fixed structures 2V32 + 760 fixed structures 2V16
  • 333 km of solar cables
  • 483 km of AC cables (Low Voltage)
  • 85 km of Medium Voltage cables